Artist Facilities

  1. Home
  2. /
  3. Rentals
  4. /
  5. Promoters
  6. /
  7. Artist Facilities

Production Office

Both the production office and the Local No. 1 stagehands office is on Stage Level.

 

Dressing Rooms

All dressing rooms are ADA accessible.

 

STAGE LEVEL

  • 1 Star Dressing Room: 2 Vanity Mirrors, toilet, shower.
  • Principal Dressing Room 1: 5 vanity mirrors, 2 sinks, toilet, and shower;
  • Principal Dressing Room 2: 5 vanity mirrors, 2 sinks, toilet, and shower.
  • Principal Dressing Room 3: 8 vanity mirrors, toilet, and shower.

BASEMENT LEVEL

  • Access to USL and USR via stair, elevator access to SL.
  • Dressing Room 1: 8 vanity mirrors, 2 toilets 2 sinks, shower.
  • Dressing Room 2: 10 vanity mirrors. 2 toilets, 2 sinks, shower.

MEZZANINE LEVEL

  • Chorus dressing room 1: 7 fixed vanity mirrors each, slop sink, 3 sinks, 3 toilets, and 2 showers.
  • Chorus Dressing Room 2: 7 fixed vanity mirrors each, slop sink, 3 sinks, 3 toilets, and 2 showers.
  • Access to SL via stairs and elevator.

GREEN ROOM

  • Capacity: 20 at a seating
  • Located
  • 1 8’ tables
  • 30 + chairs
  • Cabinets and sink
  • Refrigerator
  • Microwave
  • Used for dining, meetings, wardrobe, catering, storage